But the flood control projects will bring about a series of changes to the river channel evolution of the Yangtze, the river lake relation and hydrologic regime etc.
但防洪工程建设项目实施后,将给长江河道演变、江湖关系、水文情势等带来一系列的变化。
Its trial operation during flood season bespeaks that the system can meet the requirement of time effectiveness for water regime information transmission.
经过汛期的试运行,说明该系统能满足水情传递的时效性要求。
This paper analyses the effect of the project on the river regime and flood control by using of physical model.
通过实体模型试验,对工程修建后对所在河段河势与防洪的影响进行了分析研究,为工程设计提供了科学依据。
应用推荐